Question

Ability to change order of guide buttons

  • 22 April 2024
  • 0 replies
  • 18 views

Hi everyone

I’m using the descriptive tooltip default template for a guide walk through. In the image you can see that I’ve enabled the Next (start) button and the Skip button. Ideally I would like to flipflop the two buttons so the Next button is on the right side. I’m unable to figure out how you could customize this. 

Has anyone dealt with this need before? Thanks!

 


0 replies

Be the first to reply!

Reply