Ability to break the connections in Advanced Outreach
None
It would be great if the Advanced Outreach canvas had the ability to delete a connection between two actions to insert additional steps, or, even better, if the actions were drag and drop.
It's extremely redundant to build a 10 step outreach to realize you'd like to change from a wait step to a conditional wait step at say, the second step. Or if you want to add a CTA step between 6 and 7. Currently, you have to delete all steps following where you'd like to make the change, and with that, all of the settings of the deleted steps (like all details in a Create CTA action). Then you have to re-add the deleted steps.
Instead, I'd like to be able to delete the link on either side of the action I want to change, and should be able to insert additional actions before or after any action.
It's extremely redundant to build a 10 step outreach to realize you'd like to change from a wait step to a conditional wait step at say, the second step. Or if you want to add a CTA step between 6 and 7. Currently, you have to delete all steps following where you'd like to make the change, and with that, all of the settings of the deleted steps (like all details in a Create CTA action). Then you have to re-add the deleted steps.
Instead, I'd like to be able to delete the link on either side of the action I want to change, and should be able to insert additional actions before or after any action.
Sign up
If you ever had a profile with us, there's no need to create another one.
Don't worry if your email address has since changed, or you can't remember your login, just let us know at community@gainsight.com and we'll help you get started from where you left.
Else, please continue with the registration below.
Welcome to the Gainsight Community
Enter your username or e-mail address. We'll send you an e-mail with instructions to reset your password.
Not sure if you noticed it or not, but we did enable you to make changes upstream in a Bionic Rule provided you don't delete data that is used by a downstream step (otherwise it would leave you with broken and orphaned actions). So in your example, you can definitely add in an additional query and/or filters as long as the main process flow of data isn't interrupted.
Thanks for sharing this use case. The way we are thinking about this is along the lines of visio/lucidhcart elements where you can insert,cut, copy, paste elements as part of the journey design.
This is top of our list of journey design enhancements.
Thanks
Abhishek S
In this case my challenge is that I need to insert a step into the rule setup, and I don't see how to do that. What I have currently is:
So, once you select a data source for a rule task and save it, you can't change that data source. But, in your example if you wanted to add a step to filter out inactive accounts, could you keep steps 1 & 2 from your original task as is and just add steps 2 & 3 from your second example to the end? In other words, aggregate the data first and then filter out inactive values?
If we had a tray of tasks we could drag/drop what we want onto the canvas and connect exit/entry points of actions ourselves. It would eliminate unnecessary steps and provide a ton more flexibility.
For example, 'Continue' after a conditional wait step automatically re-enters the contact into the flow at a set point, but what if I don't want those participants to re-enter the flow until much farther down stream? This is not possible.
This is incorrectly flagged as having a workaround. A different issue was raised in the comments with a workaround provided, the workaround is unrelated to the original posting.@sai_ram
We are in the process of redesigning JO and ability to add/ delete steps in between is one of the enhancement which we would add with the redesign. ETA H1 2021.
Hey@chethana could you please look into this and help with a quick update here?