We have reports created to show the due date of specific CTA tasks grouped by week. However if there are no due dates for that particular week, the graphs skips the date. We want to be able to show 0 for these dates rather than have it skipped. Is it possible to require this on graph setup?
I tried with both line and bar graphs, and both skip the 0 week
